The 2nd Elementary school of Paschna is an
existing reinforced concrete structure, built in 1975. The structural
assesment using push-over analysis, showed inadequacies in the
building's columns. Gunite Concrete has been proposed for the
strengthening.
 |
Strengthening reinforcement of basement.
|
 |
Strengthening reinforcement of ground floor. |
|
 |
Strengthening reinforcement of 1st floor.
|
The analysis is done using Scada Pro v.22 software (ACE Hellas) and the drawings using Revit 2023 (Autodesk). Additional checks done using Idea Statica v20.1