Sunday, November 1, 2020
Monday, October 19, 2020
Sunday, October 18, 2020
THE DUQM REFINARY PROJECT: Maintenance Building
The Maintenance Building in DUQM Refinary Project, designed by our firm. Many thanks to all SALFO team for this wonderful task.
THE DQUM REFINARY PROJECT: Warehouse Building
Warehouse building in DQUM project, designed by our firm. Many thanks to all SALFO team for your colaboration.
Sunday, May 24, 2020
THE QATAR MONUMENTAL PORT PROJECT
The new Qatar Monumental port, designed by our firm. Many thanks to all SALFO team for your support & collaboration.
Friday, February 15, 2019
New Four storeys hospital building with 4 additional future stories
This is a 4-stories reinforced concrete building with a total built-up area of about 3.000m2, in Tabukh, KSA.
Wednesday, September 12, 2018
How to get a building permission in Greece.
Getting a building permission from the public domain is a whole different story in each country. Even though most of the people think that building a house in Greece is something like a life story, the truth is that you can easily get what you want, in a relatively short time, provided that you have the required documents.
Saturday, September 8, 2018
Portal frame Revit Family
Fully parametric family for portal frames.
Create quickly and easily, with just a few clicks, a portal frame of your dimensions. Choose from HEA columns and IPE rafter, change haunch length, end and base plate height.
Download link
Tuesday, September 4, 2018
Hybrid connection steel beam to concrete column detail
Wednesday, August 29, 2018
Steel beam HEA260 Splice detail
The joint has been designed for bending moment My,rd=200kNm. The most critical part is the bolts (in shear), where capacity check reaches 82.3%(<100%).
Subscribe to:
Posts (Atom)
















